TAGEBAU REICHWALDE MINE – design

Boxerg, Germany

THE CHALLENGE

It was necessary to provide access to all steel elements of the excavator (stacker) in order to perform anti-corrosion and painting works.

  • Modular scaffolding was proposed due to the complex structure of the device.
  • The project was carried out by the Scaffolding Department in Germany.

THE SOLUTION

The maximum height of the excavator was 50 m, and the overall length was 205 m. The structure was made of the “plettac Contur” system scaffolding:

  • Number of spatial scaffolding: ~ 66,000 m3.
  • Platform area: ~ 10,000 m2.
  • Total weight of elements used: ~ 740 tons.

Planning

Detailed information was obtained from the Ordering Party regarding the client’s needs in terms of the performance of the task, and the service was efficiently planned in terms of technical equipment.

Preparation

At this stage, the number of employees was completed to perform the service and

an adequate amount of scaffolding material was secured, as well as vehicles for transport. All the scaffolding was transported from Poland.

Execution

The challenge was the complicated and varied construction of the excavator, to which the scaffolding had to be adjusted to ensure the comfort of work for people performing renovation works. There were created many working platforms at different heights.

THE RESULT

The impressive structure proved to be perfect for the task

The scaffolding was completed on time, and the scale and degree of difficulty of its implementation were appreciated by the Ordering Party.

SEE ALSO

Slide

Marienhütte GmbH

Marienhütte GmbH, headquartered in Graz, is one of the most efficient steel factories in the world and the only producer of rebars in Austria.